Facility Renovation





A protected walkway was established to maintain safe access through the bowling alley while sewer repairs were underway.
This project involved repairing a damaged sewer line beneath an active bowling facility and restoring the space to full operation. Work included selective demolition, excavation, installation of new sewer piping, and complete reconstruction of the floor system. The area was fully restored with new concrete, rebuilt wood substructure, and reinstalled carpet tiles, followed by final cleaning and finishing.