Construct Storage Building

Undisclosed DoW InstallationQ1 2025US Navy
Utility locating and site layout in progress ahead of storage facility construction.
Site clearing and excavation underway to prepare for storage facility foundation construction.
Concrete slab placement in progress for storage facility foundation.
Pre-engineered storage structure installation in progress.
Completed pre-engineered storage facility ready to support operational needs.
Interior complete with LED lighting and electrical systems installed to support facility operations.

Utility locating and site layout in progress ahead of storage facility construction.

Project Scope

This project involved the construction of a new pre-engineered metal storage facility, including full site development, concrete slab installation, and building erection. Work began with site preparation activities, including tree removal, relocation of existing Connex boxes, and installation of erosion control measures. The team then completed excavation, grading, and construction of a reinforced concrete slab with perimeter footings, including subgrade compaction, aggregate base placement, and quality control testing to ensure long-term structural performance. Following site development, the team installed a 24' x 30' pre-engineered metal building rated for 140 mph wind loads, complete with doors, windows, and insulated roofing. Electrical work included installation of new underground service, a subpanel, interior and exterior lighting, receptacles, and ventilation systems. The project concluded with final grading, site stabilization, and installation of replacement trees to meet environmental requirements.

Key Features

  • Constructed a 24' x 30' pre-engineered metal storage facility with 140 mph wind rating
  • Completed full site development, including clearing, grading, and erosion control
  • Installed a reinforced concrete slab with perimeter footings and verified compaction through testing
  • Provided new electrical service, including subpanel, lighting, receptacles, and ventilation fans
  • Installed interior LED lighting and exterior wall pack fixtures for safety and efficiency
  • Performed tree removal and replacement in accordance with base environmental requirements
  • Relocated existing Connex boxes to accommodate new construction

Project Details

CategoryNew Construction
LocationUndisclosed DoW Installation
CompletedQ1 2025
ClientUS Navy